acél gerenda függőlegesen rögzítve a koncerthez

The team has now formed and poured concrete spread footings at the southern part of the new addition. Steel and metal decking have been delivered onsite and are being erected and installed throughout the site with the help of a crane. This will be an ongoing activity throughout the next couple of months. Construction has now moved its way into the existing building with the installation of floor-leveling material and preparations for window installations.

 

 

Click here to see details of Lawrence Oliver for September 2023

Click here to see September 2023 drone footage

  • Brian A. DePeña polgármester, Lawrence városa, az iskolaépítési bizottság elnöke 
  • Juan P. Rodriguez, a Lawrence Public Schools ideiglenes felügyelője
  • Odanis Hernandez, a Lawrence Public Schools operatív igazgatója
  • Walter Callahan, a Lawrence Public Schools beszerzési igazgatója
  • Timothy Caron, a Lawrence állami iskolák létesítményeinek és üzemének igazgatója
  • Shalimar Quiles, igazgató, Henry K Oliver Általános Iskola
  • Jessica Deimel, igazgató, Henry K Oliver Middle School
  • Stephany Infante, rezidens és Lawrence városi tanács tagja
  • Patricia Mariano, Lawrence Iskola Bizottsága 
  • Frank Moran képviselő, rezidens és MA állam képviselő
  • Ariel Pérez, a Lawrence Public Schools pénzügyi igazgatója
     
  • Massachusetts School Building Authority
  • Lawrence városa
  • Lawrence állami iskolák
  • Anser Advisory, tulajdonosi projektmenedzser
  • SMMA, tervező
  • Consigli Construction, építésvezető