The window and curtainwall, brick veneer, and terracotta paneling system installation are all ongoing, along with the repointing of the existing masonry. The drywall installation is close to completion on the 3rd floor and will begin soon on the 4th floor. The rough installation of the fire sprinkler system has continued on the 4th floor and has now begun on the 2nd floor. The roof top units and the emergency generator have been set in place, the stormwater and sewer building tie-ins are now completed.